Triple

T6053770
Position Surface form Disambiguated ID Type / Status
Subject DeSoto County, Mississippi E134856 entity
Predicate hasMajorHighway P385 FINISHED
Object Interstate 269 E440460 NE FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 269 | Statement: [DeSoto County, Mississippi, hasMajorHighway, Interstate 269]

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69c00877b6d4819096b0e163728b73a3 completed March 22, 2026, 3:19 p.m.
NER Named-entity recognition batch_69c05708fda48190ad3d1860969ebb6a completed March 22, 2026, 8:54 p.m.
NED1 Entity disambiguation (via context triple) batch_6a82739c2bd48190886b505d633f9365 completed Aug. 17, 2026, 2:36 a.m.
Created at: March 22, 2026, 4:09 p.m.