Triple

T4154623
Position Surface form Disambiguated ID Type / Status
Subject ITU Member States E91386 entity
Predicate approve P547 FINISHED
Object ITU strategic plan LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ITU strategic plan | Statement: [ITU Member States, approve, ITU strategic plan]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: approve
Context triple: [ITU Member States, approve, ITU strategic plan]
  • A. approves chosen
    Indicates that one entity formally accepts, authorizes, or agrees to a proposal, action, or decision made by another entity.
  • B. approvedBy
    Indicates that an action, request, or item has received formal authorization or consent from a specified entity.
  • C. approvalStatus
    Indicates the current state of authorization or acceptance granted to an entity or action.
  • D. approvedAt
    Indicates the date and time at which an entity received formal approval.
  • E. approvalMethod
    Indicates the method or process by which approval is granted or obtained between entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9626ebc8190a39de631788bea3e completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69af0321eee88190871c1d4bf44a5007 completed March 9, 2026, 5:28 p.m.
PD Predicate disambiguation batch_69af018dc90c8190a754b1bfbc802e80 completed March 9, 2026, 5:21 p.m.
Created at: March 9, 2026, 3:44 p.m.