Triple

T38667117
Position Surface form Disambiguated ID Type / Status
Subject Skagit River Hydroelectric Project E940481 entity
Predicate hasPart P35 FINISHED
Object Ross Powerhouse
Ross Powerhouse is a major hydroelectric generating station on the Skagit River in Washington State, forming part of Seattle City Light’s Skagit River Hydroelectric Project.
E2281108 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ross Powerhouse | Statement: [Skagit River Hydroelectric Project, hasPart, Ross Powerhouse]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Ross Powerhouse
Triple: [Skagit River Hydroelectric Project, hasPart, Ross Powerhouse]
Generated description
Ross Powerhouse is a major hydroelectric generating station on the Skagit River in Washington State, forming part of Seattle City Light’s Skagit River Hydroelectric Project.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76edfde348190bf6529d9f49ecd62 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fcdc0f4d048190a4b53c3d10d823d1 completed May 7, 2026, 6:38 p.m.
NED1 Entity disambiguation (via context triple) batch_6a4205be550881908c6dd87840f9def1 completed June 29, 2026, 5:42 a.m.
NEDg Description generation batch_6a4206ac72a88190b9aceed03c03849a completed June 29, 2026, 5:46 a.m.
NED2 Entity disambiguation (via description) batch_6a42070c71cc8190a961b535af40af92 completed June 29, 2026, 5:47 a.m.
Created at: May 3, 2026, 4:33 p.m.