Triple

T38630090
Position Surface form Disambiguated ID Type / Status
Subject Coastal Classic Train E937427 entity
Predicate typicalOperationMonths P11688 FINISHED
Object May LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: May | Statement: [Coastal Classic Train, typicalOperationMonths, May]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: typicalOperationMonths
Context triple: [Coastal Classic Train, typicalOperationMonths, May]
  • A. typicalMonthOfOccurrence chosen
    Indicates the month in which something most commonly or typically occurs.
  • B. operatingMonthsApproximate
    Indicates that the time period during which something operates is specified in approximate months rather than exact dates.
  • C. typicalMeetingMonth
    Indicates the month in which an entity most commonly or usually holds its meetings.
  • D. appliesDuringMonths
    Indicates that something is valid, active, or in effect only during specific months of the year.
  • E. typicalEventMonth
    Indicates the month in which an event or type of event typically occurs.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed5ca3c81909288f61fbf37b359 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_6a037c9141dc819098d7fcc36e69882c completed May 12, 2026, 7:16 p.m.
PD Predicate disambiguation batch_6a037a2026248190b894436a578d79ac completed May 12, 2026, 7:06 p.m.
Created at: May 3, 2026, 4:32 p.m.