Triple
T38521733
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Godavari River basin |
E922492
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Polavaram Project
The Polavaram Project is a major multipurpose irrigation and hydroelectric dam project in India designed to provide water for agriculture, drinking, and power generation while also aiding flood control in the Godavari River region.
|
E2272928
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Polavaram Project | Statement: [Godavari River basin, hasDam, Polavaram Project]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Polavaram Project Triple: [Godavari River basin, hasDam, Polavaram Project]
Generated description
The Polavaram Project is a major multipurpose irrigation and hydroelectric dam project in India designed to provide water for agriculture, drinking, and power generation while also aiding flood control in the Godavari River region.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ea5f5588190bd0b28c82e975640 |
completed | May 3, 2026, 3:49 p.m. |
| NER | Named-entity recognition | batch_69fcd29417e881908f996292c5371cba |
completed | May 7, 2026, 5:57 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a41d667dfd8819084e8f890d9b25e59 |
completed | June 29, 2026, 2:20 a.m. |
| NEDg | Description generation | batch_6a41d76488e08190aa54210ce86c1c1d |
completed | June 29, 2026, 2:24 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a41d80d37f88190936ab414f4a8285e |
completed | June 29, 2026, 2:27 a.m. |
Created at: May 3, 2026, 4:32 p.m.