Triple
T38521731
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Godavari River basin |
E922492
|
entity |
| Predicate | hasDam |
P8736
|
FINISHED |
| Object |
Sriram Sagar Dam
Sriram Sagar Dam is a major multipurpose reservoir project in Telangana, India, built on the Godavari River to provide irrigation, drinking water, and hydroelectric power to the surrounding regions.
|
E2274611
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sriram Sagar Dam | Statement: [Godavari River basin, hasDam, Sriram Sagar Dam]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Sriram Sagar Dam Triple: [Godavari River basin, hasDam, Sriram Sagar Dam]
Generated description
Sriram Sagar Dam is a major multipurpose reservoir project in Telangana, India, built on the Godavari River to provide irrigation, drinking water, and hydroelectric power to the surrounding regions.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ea5f5588190bd0b28c82e975640 |
completed | May 3, 2026, 3:49 p.m. |
| NER | Named-entity recognition | batch_69fcd29417e881908f996292c5371cba |
completed | May 7, 2026, 5:57 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a41e026ddec8190853a0d095127ff2f |
completed | June 29, 2026, 3:01 a.m. |
| NEDg | Description generation | batch_6a41e144b5288190a0151e596e7ceef6 |
completed | June 29, 2026, 3:06 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a41e1c14b4c81908b2d6358dbd3ae0f |
completed | June 29, 2026, 3:08 a.m. |
Created at: May 3, 2026, 4:32 p.m.