Triple

T38479914
Position Surface form Disambiguated ID Type / Status
Subject Roebling family E915642 entity
Predicate hasNotableMember P304 FINISHED
Object Siegmund Roebling
Siegmund Roebling is a notable member of the Roebling family, the prominent American engineering dynasty best known for designing and building major suspension bridges such as the Brooklyn Bridge.
E2281045 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Siegmund Roebling | Statement: [Roebling family, hasNotableMember, Siegmund Roebling]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Siegmund Roebling
Triple: [Roebling family, hasNotableMember, Siegmund Roebling]
Generated description
Siegmund Roebling is a notable member of the Roebling family, the prominent American engineering dynasty best known for designing and building major suspension bridges such as the Brooklyn Bridge.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8ff5cc8190a88803369183845e completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fcd2215c348190a3b3407d399752a5 completed May 7, 2026, 5:55 p.m.
NED1 Entity disambiguation (via context triple) batch_6a4205ae18308190b980a41d0fe4906e completed June 29, 2026, 5:42 a.m.
NEDg Description generation batch_6a42064233248190abfd4c359b9bb370 completed June 29, 2026, 5:44 a.m.
NED2 Entity disambiguation (via description) batch_6a420669a91481909f6ab987ffc2c9d0 completed June 29, 2026, 5:45 a.m.
Created at: May 3, 2026, 4:31 p.m.