Triple

T38062279
Position Surface form Disambiguated ID Type / Status
Subject Bridges by Isambard Kingdom Brunel E950374 entity
Predicate instanceOf P0 FINISHED
Object works of civil engineering C3635 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: works of civil engineering
Context triple: [Bridges by Isambard Kingdom Brunel, instanceOf, works of civil engineering]
  • A. civil engineering landmark chosen
    A civil engineering landmark is a significant structure or project—such as a bridge, dam, tunnel, or roadway—that exemplifies notable achievement, innovation, or historical importance in the field of civil engineering.
  • B. era of hydraulic engineering
    The era of hydraulic engineering is a historical period characterized by the systematic design, construction, and management of water control structures and systems to support human activities such as agriculture, urbanization, transportation, and energy production.
  • C. civil engineer
    A civil engineer is a professional who designs, constructs, and maintains infrastructure projects such as roads, bridges, buildings, and water systems to ensure safety, functionality, and sustainability.
  • D. corps of engineers
    A corps of engineers is an organized body of military or civilian engineers responsible for planning, designing, constructing, and maintaining infrastructure and technical projects, often in support of national defense or public works.
  • E. military engineering system
    A military engineering system is an integrated framework of technologies, processes, and organizational structures designed to plan, construct, maintain, and protect military infrastructure and capabilities in support of defense operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76f01e63c819093b6012fc974f35a completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:21 p.m.