Triple
T37904163
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Spanish Maldives |
E945502
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | informal geographical term |
C9492
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: informal geographical term Context triple: [Spanish Maldives, instanceOf, informal geographical term]
-
A.
informal geographic name
chosen
An informal geographic name is a non-official, commonly used label for a place or region that may not appear in formal records or maps but is widely recognized in everyday language.
-
B.
colloquial term
A colloquial term is an informal word or expression commonly used in everyday speech within a particular region or group, but typically avoided in formal writing or contexts.
-
C.
informal military term
An informal military term is a non-official, colloquial expression used by service members to describe people, equipment, situations, or procedures within a military context.
-
D.
regional toponym
A regional toponym is a place name that designates a broader geographic area or region, such as a province, territory, or cultural-geographic zone, rather than a specific settlement or landmark.
-
E.
colloquial region
A colloquial region is an area defined by informal, commonly used names or perceptions rather than official administrative or legal boundaries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ef20bb0819088b5b6ceecb0b8fc |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:20 p.m.