Triple
T37817576
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Greenstone Church |
E942816
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Romanesque Revival church |
C10197
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Romanesque Revival church Context triple: [Greenstone Church, instanceOf, Romanesque Revival church]
-
A.
Gothic Revival church
A Gothic Revival church is a Christian worship building designed in the 19th-century revival of medieval Gothic architecture, featuring pointed arches, ribbed vaults, and ornate tracery.
-
B.
Romanesque Revival building
chosen
A Romanesque Revival building is a structure designed in a 19th-century historicist style that reinterprets medieval Romanesque architecture through features like round arches, heavy masonry, robust towers, and deeply recessed openings.
-
C.
neo-Romanesque church
A neo-Romanesque church is a religious building designed in a 19th- or early 20th-century revival of Romanesque architecture, featuring rounded arches, thick walls, sturdy piers, and often simple, massive forms.
-
D.
Renaissance-style church
A Renaissance-style church is a religious building characterized by symmetrical proportions, classical columns and pilasters, domes or central plans, and harmonious geometric order inspired by ancient Greco-Roman architecture.
-
E.
Historic church
A historic church is a long-standing religious building of significant architectural, cultural, and spiritual importance that reflects the beliefs, artistry, and community life of its era.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ee987588190906506e759be5db3 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:19 p.m.