Triple
T37617572
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Matsushita IMP Building |
E935968
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-purpose building |
C12924
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-purpose building Context triple: [Matsushita IMP Building, instanceOf, multi-purpose building]
-
A.
multi-purpose facility
chosen
A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
-
B.
utility-related building
A utility-related building is a structure designed to support essential infrastructure services such as power, water, waste management, or telecommunications.
-
C.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
-
D.
building
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
E.
office building complex
An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ed16b748190ad6add183b1be688 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:18 p.m.