Triple

T37617572
Position Surface form Disambiguated ID Type / Status
Subject Matsushita IMP Building E935968 entity
Predicate instanceOf P0 FINISHED
Object multi-purpose building C12924 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: multi-purpose building
Context triple: [Matsushita IMP Building, instanceOf, multi-purpose building]
  • A. multi-purpose facility chosen
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • B. utility-related building
    A utility-related building is a structure designed to support essential infrastructure services such as power, water, waste management, or telecommunications.
  • C. civic building complex
    A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
  • D. building
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • E. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ed16b748190ad6add183b1be688 completed May 3, 2026, 3:50 p.m.
Created at: May 3, 2026, 4:18 p.m.