Triple
T37299005
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Lake Lothing Harbour |
E925886
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commercial waterway |
C3393
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commercial waterway Context triple: [Lake Lothing Harbour, instanceOf, commercial waterway]
-
A.
navigable waterway
chosen
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
B.
secondary waterway
A secondary waterway is a smaller, subordinate channel or route connected to a primary waterway, used to support additional navigation, drainage, or water distribution functions.
-
C.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
D.
waterway navigation system
A waterway navigation system is an integrated set of tools, sensors, and software that provides real-time guidance, routing, and safety information for vessels traveling on rivers, canals, and other inland or coastal waterways.
-
E.
baroque waterway
A baroque waterway is an ornately designed canal or watercourse, often integrated into grand landscapes or urban plans, characterized by elaborate curves, decorative features, and dramatic visual perspectives typical of the Baroque style.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76eb0f86c819098dee07393e69ec3 |
completed | May 3, 2026, 3:50 p.m. |
Created at: May 3, 2026, 4:16 p.m.