Triple

T37244617
Position Surface form Disambiguated ID Type / Status
Subject Tom Green County, Texas E923812 entity
Predicate hasMajorHighway P385 FINISHED
Object State Highway Loop 306
State Highway Loop 306 is a major roadway in San Angelo, Texas, functioning as a key loop route that helps divert traffic around the city and connect several primary highways in Tom Green County.
E2248041 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: State Highway Loop 306 | Statement: [Tom Green County, Texas, hasMajorHighway, State Highway Loop 306]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: State Highway Loop 306
Triple: [Tom Green County, Texas, hasMajorHighway, State Highway Loop 306]
Generated description
State Highway Loop 306 is a major roadway in San Angelo, Texas, functioning as a key loop route that helps divert traffic around the city and connect several primary highways in Tom Green County.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ea9fee88190a589f661d95a7189 completed May 3, 2026, 3:50 p.m.
NER Named-entity recognition batch_69fb36fb4bc8819095ed76f48e7bb8d6 completed May 6, 2026, 12:41 p.m.
NED1 Entity disambiguation (via context triple) batch_6a410ca7b78c81909f11938ca4b31764 completed June 28, 2026, 11:59 a.m.
NEDg Description generation batch_6a410d5215e88190b53f93c0bfc61bfd completed June 28, 2026, 12:02 p.m.
NED2 Entity disambiguation (via description) batch_6a410e09a0d48190aae6deab051064a3 completed June 28, 2026, 12:05 p.m.
Created at: May 3, 2026, 4:15 p.m.