Triple
T37195250
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teesta hydropower cascade |
E921572
|
entity |
| Predicate | hasComponent |
P35
|
FINISHED |
| Object |
Teesta Stage II Hydroelectric Project
Teesta Stage II Hydroelectric Project is a major hydroelectric power station on the Teesta River in India, forming part of the larger Teesta hydropower cascade developed to harness the river’s energy for electricity generation.
|
E2218741
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Stage II Hydroelectric Project | Statement: [Teesta hydropower cascade, hasComponent, Teesta Stage II Hydroelectric Project]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Teesta Stage II Hydroelectric Project Triple: [Teesta hydropower cascade, hasComponent, Teesta Stage II Hydroelectric Project]
Generated description
Teesta Stage II Hydroelectric Project is a major hydroelectric power station on the Teesta River in India, forming part of the larger Teesta hydropower cascade developed to harness the river’s energy for electricity generation.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ea313a08190a54404cd1e47da90 |
completed | May 3, 2026, 3:49 p.m. |
| NER | Named-entity recognition | batch_69fb36409774819091aede6881cd60b7 |
completed | May 6, 2026, 12:38 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a4043b519fc8190952e775ebaf0b8cf |
completed | June 27, 2026, 9:42 p.m. |
| NEDg | Description generation | batch_6a404461ff1c8190ae3ed2dbedc8dc48 |
completed | June 27, 2026, 9:45 p.m. |
| NED2 | Entity disambiguation (via description) | batch_6a40457ebde88190b43dc9291ec1b2de |
completed | June 27, 2026, 9:49 p.m. |
Created at: May 3, 2026, 4:15 p.m.