Triple

T37195249
Position Surface form Disambiguated ID Type / Status
Subject Teesta hydropower cascade E921572 entity
Predicate hasComponent P35 FINISHED
Object Teesta Stage I Hydroelectric Project
Teesta Stage I Hydroelectric Project is a major run-of-the-river hydropower plant on the Teesta River in India, forming part of the larger Teesta hydropower cascade developed to generate electricity and support regional energy needs.
E2217220 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Teesta Stage I Hydroelectric Project | Statement: [Teesta hydropower cascade, hasComponent, Teesta Stage I Hydroelectric Project]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Teesta Stage I Hydroelectric Project
Triple: [Teesta hydropower cascade, hasComponent, Teesta Stage I Hydroelectric Project]
Generated description
Teesta Stage I Hydroelectric Project is a major run-of-the-river hydropower plant on the Teesta River in India, forming part of the larger Teesta hydropower cascade developed to generate electricity and support regional energy needs.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ea313a08190a54404cd1e47da90 completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fb36409774819091aede6881cd60b7 completed May 6, 2026, 12:38 p.m.
NED1 Entity disambiguation (via context triple) batch_6a40361768a88190ab0fc27efbc5e1d8 completed June 27, 2026, 8:44 p.m.
NEDg Description generation batch_6a4036aa606081908c37cae19a44be22 completed June 27, 2026, 8:46 p.m.
NED2 Entity disambiguation (via description) batch_6a4038210f388190a2546f1de996a3db completed June 27, 2026, 8:52 p.m.
Created at: May 3, 2026, 4:15 p.m.