Triple

T37031098
Position Surface form Disambiguated ID Type / Status
Subject Belarus–Poland waterway network E916496 entity
Predicate instanceOf P0 FINISHED
Object transboundary infrastructure C9303 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transboundary infrastructure
Context triple: [Belarus–Poland waterway network, instanceOf, transboundary infrastructure]
  • A. cross-border energy infrastructure project
    A cross-border energy infrastructure project is a coordinated initiative to plan, finance, build, and operate energy facilities—such as pipelines, transmission lines, or interconnectors—that physically link and serve multiple countries’ energy systems.
  • B. transboundary region
    A transboundary region is a geographically contiguous area that spans across the borders of two or more political or administrative jurisdictions, sharing interconnected environmental, economic, social, or cultural systems.
  • C. cross-border transport link chosen
    A cross-border transport link is an infrastructure connection—such as a road, railway, bridge, tunnel, or ferry route—that enables the movement of people and goods between two or more countries.
  • D. international border
    An international border is a legally defined geographic boundary that separates the territories and jurisdictions of two or more sovereign states.
  • E. transboundary river system
    A transboundary river system is a network of rivers and related water bodies that cross or form political borders between two or more countries, requiring shared management and governance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e92c7648190bcfa277f64c71a21 completed May 3, 2026, 3:49 p.m.
Created at: May 3, 2026, 4:14 p.m.