Triple
T37015982
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Stoney Creek Bridge |
E916080
|
entity |
| Predicate | railwayLine |
P848
|
FINISHED |
| Object |
CPR Mountain Subdivision
The CPR Mountain Subdivision is a key Canadian Pacific Railway mainline segment through the Rocky Mountains in British Columbia, known for its steep grades, tunnels, and major engineering works along the transcontinental route.
|
E2208327
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CPR Mountain Subdivision | Statement: [Stoney Creek Bridge, railwayLine, CPR Mountain Subdivision]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: CPR Mountain Subdivision Triple: [Stoney Creek Bridge, railwayLine, CPR Mountain Subdivision]
Generated description
The CPR Mountain Subdivision is a key Canadian Pacific Railway mainline segment through the Rocky Mountains in British Columbia, known for its steep grades, tunnels, and major engineering works along the transcontinental route.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e920dc48190acb6bb7ebc4dffab |
completed | May 3, 2026, 3:49 p.m. |
| NER | Named-entity recognition | batch_69fa007c09f0819096df63f6fcd975f0 |
completed | May 5, 2026, 2:36 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a3e5772d36c8190bcb3e835023a08dc |
completed | June 26, 2026, 10:41 a.m. |
| NEDg | Description generation | batch_6a3e591d57608190bd82a60c74d1ae1d |
completed | June 26, 2026, 10:49 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a3e5f4a910081908f9ff844c1feb1ae |
completed | June 26, 2026, 11:15 a.m. |
Created at: May 3, 2026, 4:14 p.m.