Triple

T36996371
Position Surface form Disambiguated ID Type / Status
Subject Marston Green railway station E915238 entity
Predicate line P1293 FINISHED
Object Birmingham–London Euston line
The Birmingham–London Euston line is a major inter-city and commuter railway route in England connecting Birmingham with London Euston as part of the West Coast Main Line.
E2215034 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Birmingham–London Euston line | Statement: [Marston Green railway station, line, Birmingham–London Euston line]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Birmingham–London Euston line
Triple: [Marston Green railway station, line, Birmingham–London Euston line]
Generated description
The Birmingham–London Euston line is a major inter-city and commuter railway route in England connecting Birmingham with London Euston as part of the West Coast Main Line.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8f1a8c81909db172ed31304971 completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69f9ffe1d8848190927c0d0b4ff90d5a completed May 5, 2026, 2:34 p.m.
NED1 Entity disambiguation (via context triple) batch_6a402b9788e48190aded4f313d09d56a completed June 27, 2026, 7:59 p.m.
NEDg Description generation batch_6a402c0e80cc819084457297be9a3d02 completed June 27, 2026, 8:01 p.m.
NED2 Entity disambiguation (via description) batch_6a402cf925948190bcb4e1f3848eef85 completed June 27, 2026, 8:05 p.m.
Created at: May 3, 2026, 4:14 p.m.