Triple

T36973748
Position Surface form Disambiguated ID Type / Status
Subject Transnet SOC Ltd E914640 entity
Predicate subsidiary P258 FINISHED
Object Transnet Pipelines
Transnet Pipelines is the division of South Africa’s state-owned freight and logistics company responsible for operating and maintaining the country’s strategic petroleum and gas pipeline network.
E914640 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Transnet Pipelines | Statement: [Transnet SOC Ltd, subsidiary, Transnet Pipelines]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Transnet Pipelines
Triple: [Transnet SOC Ltd, subsidiary, Transnet Pipelines]
Generated description
Transnet Pipelines is the division of South Africa’s state-owned freight and logistics company responsible for operating and maintaining the country’s strategic petroleum and gas pipeline network.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e8d13b4819089af24a47ce092fc completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69f9ff50c5c4819099a8d8802133d218 completed May 5, 2026, 2:31 p.m.
NED1 Entity disambiguation (via context triple) batch_6a3e2c49f33081908fb61f4dd0a53525 completed June 26, 2026, 7:37 a.m.
NEDg Description generation batch_6a3e2cf5b99c8190b0f2573e57f9d5d7 completed June 26, 2026, 7:40 a.m.
NED2 Entity disambiguation (via description) batch_6a3e43348bd88190bd7b9886e07e2a65 completed June 26, 2026, 9:15 a.m.
Created at: May 3, 2026, 4:14 p.m.