Triple

T36274370
Position Surface form Disambiguated ID Type / Status
Subject Ruabon–Barmouth line E892763 entity
Predicate connectedTo P37 FINISHED
Object Cambrian Line at Barmouth
The Cambrian Line at Barmouth is a coastal railway route in Wales that forms part of the scenic Cambrian Coast Railway, serving the town of Barmouth and linking it to other destinations across mid and north-west Wales.
E2177252 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cambrian Line at Barmouth | Statement: [Ruabon–Barmouth line, connectedTo, Cambrian Line at Barmouth]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Cambrian Line at Barmouth
Triple: [Ruabon–Barmouth line, connectedTo, Cambrian Line at Barmouth]
Generated description
The Cambrian Line at Barmouth is a coastal railway route in Wales that forms part of the scenic Cambrian Coast Railway, serving the town of Barmouth and linking it to other destinations across mid and north-west Wales.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e488f34819083e254dbe288c27a completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69f7b9aa1e2481909bed33497d0af898 completed May 3, 2026, 9:10 p.m.
NED1 Entity disambiguation (via context triple) batch_6a396e13639881909ca61dd0d92a5932 completed June 22, 2026, 5:17 p.m.
NEDg Description generation batch_6a3972de8d488190ab8ef326be68ca79 completed June 22, 2026, 5:37 p.m.
NED2 Entity disambiguation (via description) batch_6a397412522c8190bf5bd4a9f586261d completed June 22, 2026, 5:42 p.m.
Created at: May 3, 2026, 4:09 p.m.