Triple

T36273872
Position Surface form Disambiguated ID Type / Status
Subject Brown Line Capacity Expansion Project E892750 entity
Predicate instanceOf P0 FINISHED
Object Chicago Transit Authority project C64956 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chicago Transit Authority project
Context triple: [Brown Line Capacity Expansion Project, instanceOf, Chicago Transit Authority project]
  • A. Chicago Transit Authority facility
    A Chicago Transit Authority facility is any physical property, such as stations, garages, rail yards, offices, or maintenance shops, owned or operated by the CTA to support the provision, operation, and administration of public transit services in the Chicago metropolitan area.
  • B. Chicago Transit Authority service
    Chicago Transit Authority service represents the public transportation operations, including bus and rail routes, schedules, and related customer services, provided by the CTA within the Chicago metropolitan area.
  • C. Chicago 'L' service
    Chicago 'L' service is the rapid transit system of Chicago, consisting of elevated, subway, and at-grade rail lines that provide frequent urban and suburban passenger transportation across the metropolitan area.
  • D. Los Angeles Metro project
    The Los Angeles Metro project is a large-scale public transportation initiative focused on expanding and improving the region’s rail and bus networks to enhance mobility, reduce congestion, and support sustainable urban growth across Los Angeles County.
  • E. Chicago 'L' branch
    A Chicago 'L' branch is a specific route segment of the Chicago elevated rapid transit system that diverges from a main line to serve particular neighborhoods or corridors.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e488f34819083e254dbe288c27a completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:09 p.m.