Triple

T36158833
Position Surface form Disambiguated ID Type / Status
Subject Captain J. E. P. Howey E1045815 entity
Predicate instanceOf P0 FINISHED
Object railway company founder C65001 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway company founder
Context triple: [Captain J. E. P. Howey, instanceOf, railway company founder]
  • A. railroad magnate
    A railroad magnate is a powerful and wealthy business leader who controls, develops, and profits from major railway enterprises and infrastructure.
  • B. railroad pioneer
    A railroad pioneer is an early visionary, engineer, or entrepreneur who played a foundational role in conceiving, building, or expanding railway systems, often overcoming significant technical, financial, and social obstacles.
  • C. railway construction company
    A railway construction company is an organization that plans, designs, and builds railway infrastructure, including tracks, stations, bridges, and related systems, often coordinating engineering, procurement, and project management activities.
  • D. railway holding company
    A railway holding company is a parent corporation that owns and controls one or more railway operating or infrastructure companies, managing their strategic direction and financial interests without necessarily running day-to-day train operations itself.
  • E. pre-grouping railway company
    A pre-grouping railway company is a privately owned or regionally based railway operator in the United Kingdom that existed before the 1923 Railways Act consolidated most railways into the "Big Four" groups.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e38903c8190a52887620f90aabe completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:08 p.m.