Triple

T36005101
Position Surface form Disambiguated ID Type / Status
Subject R1–R9 series E1041241 entity
Predicate followedBy P78 FINISHED
Object R10 subway cars
The R10 subway cars were a post–World War II generation of New York City Subway rolling stock built for the IND lines, notable for their rugged all-steel construction and long service life beginning in the late 1940s.
E2168520 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: R10 subway cars | Statement: [R1–R9 series, followedBy, R10 subway cars]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: R10 subway cars
Triple: [R1–R9 series, followedBy, R10 subway cars]
Generated description
The R10 subway cars were a post–World War II generation of New York City Subway rolling stock built for the IND lines, notable for their rugged all-steel construction and long service life beginning in the late 1940s.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2a02208190aedd1f9025a8b300 completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69f7acaec1508190a38f2ac9cc5383e7 completed May 3, 2026, 8:14 p.m.
NED1 Entity disambiguation (via context triple) batch_6a38d52bf05881908ca033d0cd0db9c2 completed June 22, 2026, 6:24 a.m.
NEDg Description generation batch_6a38d5fbbf84819083a18d64edddbbe6 completed June 22, 2026, 6:28 a.m.
NED2 Entity disambiguation (via description) batch_6a38d6a758c08190b24130489eafeb43 completed June 22, 2026, 6:31 a.m.
Created at: May 3, 2026, 4:07 p.m.