Triple
T35909611
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Yonki Dam |
E1038568
|
entity |
| Predicate | connectedTo |
P37
|
FINISHED |
| Object |
Ramu power transmission network
The Ramu power transmission network is a major high-voltage grid in Papua New Guinea that distributes electricity generated from hydroelectric sources such as the Yonki Dam across the Ramu region and beyond.
|
E2161743
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ramu power transmission network | Statement: [Yonki Dam, connectedTo, Ramu power transmission network]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Ramu power transmission network Triple: [Yonki Dam, connectedTo, Ramu power transmission network]
Generated description
The Ramu power transmission network is a major high-voltage grid in Papua New Guinea that distributes electricity generated from hydroelectric sources such as the Yonki Dam across the Ramu region and beyond.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e2259608190bf6788a132e0d139 |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_69f7aa71a66c81909dba6a2c3466284c |
completed | May 3, 2026, 8:05 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a38ae2b4d5c8190ac0caa7f3ece9b11 |
completed | June 22, 2026, 3:38 a.m. |
| NEDg | Description generation | batch_6a38aed9c3608190be4d8a738722fc4f |
completed | June 22, 2026, 3:41 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a38afe3882c819094065a02436b8868 |
completed | June 22, 2026, 3:45 a.m. |
Created at: May 3, 2026, 4:07 p.m.