Triple

T35420424
Position Surface form Disambiguated ID Type / Status
Subject Chone River basin E1023767 entity
Predicate hasInfrastructure P2560 FINISHED
Object Chone Multipurpose Dam
Chone Multipurpose Dam is a major water infrastructure project in Ecuador designed to provide flood control, irrigation, and water supply for communities in the Chone River region.
E2167853 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Chone Multipurpose Dam | Statement: [Chone River basin, hasInfrastructure, Chone Multipurpose Dam]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Chone Multipurpose Dam
Triple: [Chone River basin, hasInfrastructure, Chone Multipurpose Dam]
Generated description
Chone Multipurpose Dam is a major water infrastructure project in Ecuador designed to provide flood control, irrigation, and water supply for communities in the Chone River region.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76df6704081909900c60be10d5849 completed May 3, 2026, 3:47 p.m.
NER Named-entity recognition batch_69f7958b1e2481909227813f382e79a0 completed May 3, 2026, 6:35 p.m.
NED1 Entity disambiguation (via context triple) batch_6a38d51d0aa0819093ecce427047fc66 completed June 22, 2026, 6:24 a.m.
NEDg Description generation batch_6a38d58d00c48190b675fee8bef79411 completed June 22, 2026, 6:26 a.m.
NED2 Entity disambiguation (via description) batch_6a38d67cd2c081908e943d16fade52ed completed June 22, 2026, 6:30 a.m.
Created at: May 3, 2026, 4:03 p.m.