Triple

T35349900
Position Surface form Disambiguated ID Type / Status
Subject Eastern Line (Sri Lanka) E1020848 entity
Predicate junctionStation P14465 FINISHED
Object Gal Oya Junction railway station
Gal Oya Junction railway station is a key railway junction in eastern Sri Lanka that connects the Eastern Line with other regional rail routes.
E2137425 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gal Oya Junction railway station | Statement: [Eastern Line (Sri Lanka), junctionStation, Gal Oya Junction railway station]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Gal Oya Junction railway station
Triple: [Eastern Line (Sri Lanka), junctionStation, Gal Oya Junction railway station]
Generated description
Gal Oya Junction railway station is a key railway junction in eastern Sri Lanka that connects the Eastern Line with other regional rail routes.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76decd95c8190ae428f6a19d535de completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69f7919508cc819092d2b78eec5fd881 completed May 3, 2026, 6:19 p.m.
NED1 Entity disambiguation (via context triple) batch_6a3823d3f0f48190884571e72084fea0 completed June 21, 2026, 5:48 p.m.
NEDg Description generation batch_6a3824d5a74c8190ae63ee78a409afd5 completed June 21, 2026, 5:52 p.m.
NED2 Entity disambiguation (via description) batch_6a3826b8a46c81909104152da09055b0 completed June 21, 2026, 6 p.m.
Created at: May 3, 2026, 4:03 p.m.