Triple

T35312183
Position Surface form Disambiguated ID Type / Status
Subject Siberian Unified Power System E1019800 entity
Predicate synchronizationArea P143582 FINISHED
Object Siberian synchronous zone of Russia
The Siberian synchronous zone of Russia is a major regional power grid in Siberia where all connected generators operate in unison at the same frequency, forming part of the country’s unified electric power system.
E2134184 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Siberian synchronous zone of Russia | Statement: [Siberian Unified Power System, synchronizationArea, Siberian synchronous zone of Russia]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Siberian synchronous zone of Russia
Triple: [Siberian Unified Power System, synchronizationArea, Siberian synchronous zone of Russia]
Generated description
The Siberian synchronous zone of Russia is a major regional power grid in Siberia where all connected generators operate in unison at the same frequency, forming part of the country’s unified electric power system.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76de9d45c81908a2ed0956b448b65 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69f7905842808190a4fc9917f0f4b60d completed May 3, 2026, 6:13 p.m.
NED1 Entity disambiguation (via context triple) batch_6a3819f1a4308190aad84cddf9bcd1ad completed June 21, 2026, 5:05 p.m.
NEDg Description generation batch_6a381aa74d8081908c07604175258249 completed June 21, 2026, 5:08 p.m.
NED2 Entity disambiguation (via description) batch_6a381b07217c819089d8c91dbe8a1e1e completed June 21, 2026, 5:10 p.m.
Created at: May 3, 2026, 4:03 p.m.