Triple

T34961753
Position Surface form Disambiguated ID Type / Status
Subject U.S. Route 29 in South Carolina E1008274 entity
Predicate majorJunctionWith P1018 FINISHED
Object Interstate 85 in Cherokee County
Interstate 85 in Cherokee County is a key segment of the I-85 corridor in South Carolina, serving as a major regional freeway for through traffic and local access in the Upstate area.
E2119878 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 85 in Cherokee County | Statement: [U.S. Route 29 in South Carolina, majorJunctionWith, Interstate 85 in Cherokee County]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Interstate 85 in Cherokee County
Triple: [U.S. Route 29 in South Carolina, majorJunctionWith, Interstate 85 in Cherokee County]
Generated description
Interstate 85 in Cherokee County is a key segment of the I-85 corridor in South Carolina, serving as a major regional freeway for through traffic and local access in the Upstate area.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dc69564819099e9e78aed6ff0a6 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69f78421f9c481909caf6db43f3d943a completed May 3, 2026, 5:21 p.m.
NED1 Entity disambiguation (via context triple) batch_6a37cfd7d09c8190812814beaa8c7024 completed June 21, 2026, 11:49 a.m.
NEDg Description generation batch_6a37d07ba708819081b552b8a69313e5 completed June 21, 2026, 11:52 a.m.
NED2 Entity disambiguation (via description) batch_6a37d1935d9881909cee3755fec2d996 completed June 21, 2026, 11:57 a.m.
Created at: May 3, 2026, 4 p.m.