Triple

T34919100
Position Surface form Disambiguated ID Type / Status
Subject Bargi Dam Hydroelectric Power Station E1007086 entity
Predicate instanceOf P0 FINISHED
Object hydroelectric power station C359 CONCEPT FINISHED

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dc2b6b0819095a61debbd405269 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4 p.m.