Triple

T34222742
Position Surface form Disambiguated ID Type / Status
Subject Liffey hydroelectric scheme E877966 entity
Predicate firstPowerStationCommissionedYear P29534 FINISHED
Object 1940 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1940 | Statement: [Liffey hydroelectric scheme, firstPowerStationCommissionedYear, 1940]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: firstPowerStationCommissionedYear
Context triple: [Liffey hydroelectric scheme, firstPowerStationCommissionedYear, 1940]
  • A. firstReactorCommissioned
    Indicates that the first reactor in a given context has been officially brought into operation or commissioned.
  • B. hydroelectricStationCommissioned chosen
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • C. yearFirstOperational
    Indicates the calendar year in which something first became operational or began functioning in its intended role.
  • D. isFirstCommercialNuclearPlantOf
    Indicates that one entity is recognized as the first commercial nuclear power plant associated with, or belonging to, another entity (such as a country, company, or region).
  • E. phase1CommissioningYear
    Indicates the calendar year in which the first phase of something (such as a project, facility, or system) was officially commissioned or put into operation.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349b16d0481908754e3069f05e0c1 completed April 30, 2026, 12:23 p.m.
NER Named-entity recognition batch_6a037c8ae0248190b7e2ce4bf852c22d completed May 12, 2026, 7:16 p.m.
PD Predicate disambiguation batch_6a0379fbe4a08190bfe65ebd141164e9 completed May 12, 2026, 7:05 p.m.
Created at: May 1, 2026, 1:55 a.m.