Triple

T33999278
Position Surface form Disambiguated ID Type / Status
Subject Trambaix lines T1–T3 E871770 entity
Predicate instanceOf P0 FINISHED
Object tramway line group C63688 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: tramway line group
Context triple: [Trambaix lines T1–T3, instanceOf, tramway line group]
  • A. rapid transit line group
    A rapid transit line group is a collection of closely related or jointly operated rapid transit lines that share infrastructure, service patterns, or branding within a transit network.
  • B. group of rapid transit lines
    A group of rapid transit lines is a collection of interconnected high-capacity urban rail or metro routes that operate together as a coordinated network to provide frequent, efficient public transportation.
  • C. tram line
    A tram line is a designated route, typically with fixed tracks and stops, along which trams operate to provide urban or suburban public transportation.
  • D. suburban railway group
    A suburban railway group is an organization or network that coordinates and operates rail services connecting a central city with its surrounding suburban areas, typically focusing on commuter transportation.
  • E. subway line
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3499f8cbc81908de6ec89fa91ea8f completed April 30, 2026, 12:22 p.m.
Created at: May 1, 2026, 1:50 a.m.