Triple

T33644974
Position Surface form Disambiguated ID Type / Status
Subject Zidani Most E861935 entity
Predicate onRailwayLine P848 FINISHED
Object Zidani Most–Maribor railway corridor
The Zidani Most–Maribor railway corridor is a key rail route in Slovenia that connects the central junction of Zidani Most with the northeastern city of Maribor, serving as an important part of the country’s passenger and freight network.
E2064465 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Zidani Most–Maribor railway corridor | Statement: [Zidani Most, onRailwayLine, Zidani Most–Maribor railway corridor]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Zidani Most–Maribor railway corridor
Triple: [Zidani Most, onRailwayLine, Zidani Most–Maribor railway corridor]
Generated description
The Zidani Most–Maribor railway corridor is a key rail route in Slovenia that connects the central junction of Zidani Most with the northeastern city of Maribor, serving as an important part of the country’s passenger and freight network.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3498280c48190bcc3494017d14234 completed April 30, 2026, 12:22 p.m.
NER Named-entity recognition batch_69f6f9bcf0488190914c9fcdfa649933 completed May 3, 2026, 7:31 a.m.
NED1 Entity disambiguation (via context triple) batch_6a365c69cf2c8190a6a6a0645edd6a45 completed June 20, 2026, 9:24 a.m.
NEDg Description generation batch_6a365d415b94819095be28ce74f2e717 completed June 20, 2026, 9:28 a.m.
NED2 Entity disambiguation (via description) batch_6a365db10b648190a22055323a8393f3 completed June 20, 2026, 9:30 a.m.
Created at: May 1, 2026, 1:42 a.m.