Triple

T33288400
Position Surface form Disambiguated ID Type / Status
Subject Bad Hersfeld station E852246 entity
Predicate connectsWith P37 FINISHED
Object Bebra–Fulda high-speed corridor
The Bebra–Fulda high-speed corridor is a key German railway route designed for fast passenger and freight traffic between the Bebra and Fulda regions, forming part of the country’s long-distance rail network.
E2044032 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bebra–Fulda high-speed corridor | Statement: [Bad Hersfeld station, connectsWith, Bebra–Fulda high-speed corridor]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Bebra–Fulda high-speed corridor
Triple: [Bad Hersfeld station, connectsWith, Bebra–Fulda high-speed corridor]
Generated description
The Bebra–Fulda high-speed corridor is a key German railway route designed for fast passenger and freight traffic between the Bebra and Fulda regions, forming part of the country’s long-distance rail network.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f349660ff48190a4568803d0b89941 completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6de736e648190a62e468a96de16af completed May 3, 2026, 5:34 a.m.
NED1 Entity disambiguation (via context triple) batch_6a35392bca308190a2a262b52d1ddc1d completed June 19, 2026, 12:42 p.m.
NEDg Description generation batch_6a3539e9011c81909b6971dee88beef4 completed June 19, 2026, 12:45 p.m.
NED2 Entity disambiguation (via description) batch_6a353aef184481908315142c5ef2004a completed June 19, 2026, 12:49 p.m.
Created at: May 1, 2026, 1:32 a.m.