Triple
T33123187
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | J. D. Payne |
E847654
|
entity |
| Predicate | notableProjectStartTime |
P157263
|
FINISHED |
| Object | The Lord of the Rings: The Rings of Power development in late 2010s |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: The Lord of the Rings: The Rings of Power development in late 2010s | Statement: [J. D. Payne, notableProjectStartTime, The Lord of the Rings: The Rings of Power development in late 2010s]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: notableProjectStartTime Context triple: [J. D. Payne, notableProjectStartTime, The Lord of the Rings: The Rings of Power development in late 2010s]
-
A.
notableProjectYear
Indicates the year in which a notable project associated with an entity took place, was created, or was prominently recognized.
-
B.
notableWorkPeriodStart
Indicates the point in time when an entity’s period of producing its notable work or works begins.
-
C.
notableEventTime
Indicates the specific time at which a notable or significant event occurred.
-
D.
majorProjectStartPeriod
Indicates the time period during which a major project is initiated or begins.
-
E.
inceptionOfProject
chosen
Indicates the event or point in time at which a project is initiated or begins.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f349588f088190b7c9588860f72033 |
completed | April 30, 2026, 12:21 p.m. |
| NER | Named-entity recognition | batch_6a037c894b488190bcbec2eccaff4a01 |
completed | May 12, 2026, 7:16 p.m. |
| PD | Predicate disambiguation | batch_6a0379f338b881908e5593e45d764f4d |
completed | May 12, 2026, 7:05 p.m. |
Created at: May 1, 2026, 1:27 a.m.