Triple
T33007074
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ScottishPower |
E844531
|
entity |
| Predicate | owns |
P347
|
FINISHED |
| Object |
ScottishPower Energy Networks
ScottishPower Energy Networks is the electricity transmission and distribution arm of ScottishPower, responsible for operating and maintaining power networks across parts of Scotland, England, and Wales.
|
E844531
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ScottishPower Energy Networks | Statement: [ScottishPower, owns, ScottishPower Energy Networks]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: ScottishPower Energy Networks Triple: [ScottishPower, owns, ScottishPower Energy Networks]
Generated description
ScottishPower Energy Networks is the electricity transmission and distribution arm of ScottishPower, responsible for operating and maintaining power networks across parts of Scotland, England, and Wales.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f3494e59f08190b9127c693e5c7e8f |
completed | April 30, 2026, 12:21 p.m. |
| NER | Named-entity recognition | batch_69f6d27b24b88190adcbd9634b1b7885 |
completed | May 3, 2026, 4:43 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a34dacec4b081909ff2bd7951a9c541 |
completed | June 19, 2026, 5:59 a.m. |
| NEDg | Description generation | batch_6a34db4fc32c8190a2277b24a9031669 |
completed | June 19, 2026, 6:01 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a34dbec0c9c8190ac5b263151322aba |
completed | June 19, 2026, 6:04 a.m. |
Created at: May 1, 2026, 1:23 a.m.