Triple

T32995135
Position Surface form Disambiguated ID Type / Status
Subject Turners Falls Dam E844206 entity
Predicate partOf P40 FINISHED
Object Turners Falls hydroelectric project
The Turners Falls hydroelectric project is a hydroelectric power generation complex on the Connecticut River in Massachusetts that uses the Turners Falls Dam and associated facilities to produce renewable electricity.
E2032212 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Turners Falls hydroelectric project | Statement: [Turners Falls Dam, partOf, Turners Falls hydroelectric project]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Turners Falls hydroelectric project
Triple: [Turners Falls Dam, partOf, Turners Falls hydroelectric project]
Generated description
The Turners Falls hydroelectric project is a hydroelectric power generation complex on the Connecticut River in Massachusetts that uses the Turners Falls Dam and associated facilities to produce renewable electricity.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3494d99988190b502c68926af2c4d completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6d2172f208190967d972ccf5af151 completed May 3, 2026, 4:41 a.m.
NED1 Entity disambiguation (via context triple) batch_6a34dac7221081909818658217a25311 completed June 19, 2026, 5:59 a.m.
NEDg Description generation batch_6a34dbb1e474819095ca57b4364327cd completed June 19, 2026, 6:03 a.m.
NED2 Entity disambiguation (via description) batch_6a34dc4513c48190993300ccc4c2a6d4 completed June 19, 2026, 6:05 a.m.
Created at: May 1, 2026, 1:22 a.m.