Triple

T32751111
Position Surface form Disambiguated ID Type / Status
Subject Cepu Block E837497 entity
Predicate partner P1136 FINISHED
Object PT Pertamina EP Cepu as NOC partner
PT Pertamina EP Cepu is the Indonesian national oil company subsidiary that serves as the state’s upstream partner in the development and operation of the Cepu Block oil and gas field.
E2021374 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PT Pertamina EP Cepu as NOC partner | Statement: [Cepu Block, partner, PT Pertamina EP Cepu as NOC partner]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: PT Pertamina EP Cepu as NOC partner
Triple: [Cepu Block, partner, PT Pertamina EP Cepu as NOC partner]
Generated description
PT Pertamina EP Cepu is the Indonesian national oil company subsidiary that serves as the state’s upstream partner in the development and operation of the Cepu Block oil and gas field.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34937f97c8190b7f84bea045df3ae completed April 30, 2026, 12:21 p.m.
NER Named-entity recognition batch_69f6cc2293548190be4b7d6b501337df completed May 3, 2026, 4:16 a.m.
NED1 Entity disambiguation (via context triple) batch_6a34a7b8213081909e5bae7a9a308295 completed June 19, 2026, 2:21 a.m.
NEDg Description generation batch_6a34a8fb2e0081908cdac2a172ea5c32 completed June 19, 2026, 2:27 a.m.
NED2 Entity disambiguation (via description) batch_6a34a9cef0248190bf3bef6627945496 completed June 19, 2026, 2:30 a.m.
Created at: May 1, 2026, 1:12 a.m.