Triple

T32230224
Position Surface form Disambiguated ID Type / Status
Subject Umiam Hydel Project E823319 entity
Predicate hasComponent P35 FINISHED
Object Umiam Stage II Power Station
Umiam Stage II Power Station is a hydroelectric power plant in Meghalaya, India, forming part of the multi-stage Umiam Hydel Project on the Umiam River.
E1997930 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Umiam Stage II Power Station | Statement: [Umiam Hydel Project, hasComponent, Umiam Stage II Power Station]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Umiam Stage II Power Station
Triple: [Umiam Hydel Project, hasComponent, Umiam Stage II Power Station]
Generated description
Umiam Stage II Power Station is a hydroelectric power plant in Meghalaya, India, forming part of the multi-stage Umiam Hydel Project on the Umiam River.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f3490c140481908ed53b98b561eaa1 completed April 30, 2026, 12:20 p.m.
NER Named-entity recognition batch_69f6bbf8e05c819092324664bc7ad451 completed May 3, 2026, 3:07 a.m.
NED1 Entity disambiguation (via context triple) batch_6a2f46cc0b9c8190ad2f974bdec02151 completed June 15, 2026, 12:26 a.m.
NEDg Description generation batch_6a2f47952cd081909d7ca8c81e5bc79b completed June 15, 2026, 12:30 a.m.
NED2 Entity disambiguation (via description) batch_6a2f48435cac8190ae6b9801098e7391 completed June 15, 2026, 12:33 a.m.
Created at: May 1, 2026, 12:39 a.m.