Triple

T32120097
Position Surface form Disambiguated ID Type / Status
Subject American Bridge Division of U.S. Steel E820346 entity
Predicate instanceOf P0 FINISHED
Object steel construction company C8088 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: steel construction company
Context triple: [American Bridge Division of U.S. Steel, instanceOf, steel construction company]
  • A. construction technology company
    A construction technology company develops and provides digital tools, software, and innovative systems that improve the planning, design, management, and execution of construction projects.
  • B. railway construction company
    A railway construction company is an organization that plans, designs, and builds railway infrastructure, including tracks, stations, bridges, and related systems, often coordinating engineering, procurement, and project management activities.
  • C. construction and trading company
    A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
  • D. construction conglomerate
    A construction conglomerate is a large, diversified corporate group that owns and manages multiple construction-related companies across sectors such as infrastructure, real estate, engineering, and industrial projects.
  • E. bridge construction company chosen
    A bridge construction company is a specialized engineering and construction firm that plans, designs, and builds bridges, managing all phases from feasibility studies and structural design to on-site construction and maintenance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f34902d42c819083a8e6bba9a8bb9a completed April 30, 2026, 12:20 p.m.
Created at: May 1, 2026, 12:28 a.m.