Triple

T31428145
Position Surface form Disambiguated ID Type / Status
Subject Semmering Railway E801722 entity
Predicate designer P184 FINISHED
Object Carl Ritter von Ghega
Carl Ritter von Ghega was a 19th-century Austrian civil engineer renowned as a pioneer of alpine railway construction and one of the leading figures of early European railroad engineering.
E1963713 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carl Ritter von Ghega | Statement: [Semmering Railway, designer, Carl Ritter von Ghega]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Carl Ritter von Ghega
Triple: [Semmering Railway, designer, Carl Ritter von Ghega]
Generated description
Carl Ritter von Ghega was a 19th-century Austrian civil engineer renowned as a pioneer of alpine railway construction and one of the leading figures of early European railroad engineering.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f348c475348190bf579ca858eec77c completed April 30, 2026, 12:19 p.m.
NER Named-entity recognition batch_69f6a0c284488190956d44f3ceb83470 completed May 3, 2026, 1:11 a.m.
NED1 Entity disambiguation (via context triple) batch_6a2b0774af0c81908aec108aefc58ee5 completed June 11, 2026, 7:07 p.m.
NEDg Description generation batch_6a2b0ab604d0819088ff41d08816c746 completed June 11, 2026, 7:21 p.m.
NED2 Entity disambiguation (via description) batch_6a2b0b6433e08190a02252a524458560 completed June 11, 2026, 7:24 p.m.
Created at: April 30, 2026, 8:55 p.m.