Triple

T31093274
Position Surface form Disambiguated ID Type / Status
Subject Gouvães Dam E792448 entity
Predicate gridConnection P845 FINISHED
Object Portuguese national grid
The Portuguese national grid is the high-voltage electricity transmission network that distributes power across Portugal, integrating generation sources like hydroelectric dams into the national energy system.
E1945483 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Portuguese national grid | Statement: [Gouvães Dam, gridConnection, Portuguese national grid]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Portuguese national grid
Triple: [Gouvães Dam, gridConnection, Portuguese national grid]
Generated description
The Portuguese national grid is the high-voltage electricity transmission network that distributes power across Portugal, integrating generation sources like hydroelectric dams into the national energy system.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224cf157c81909e2d2bd88c9282c3 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f6966c64cc81908eea380be3a334a1 completed May 3, 2026, 12:27 a.m.
NED1 Entity disambiguation (via context triple) batch_6a292b31833c8190a141b5ba38aa2611 completed June 10, 2026, 9:15 a.m.
NEDg Description generation batch_6a292ba68de4819084c77af7e8dae77b completed June 10, 2026, 9:17 a.m.
NED2 Entity disambiguation (via description) batch_6a292fa111e48190bd28fe36d5c911cc completed June 10, 2026, 9:34 a.m.
Created at: April 29, 2026, 9:02 p.m.