Triple
T31089977
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | West Gate Freeway |
E792355
|
entity |
| Predicate | connectsTo |
P845
|
FINISHED |
| Object |
West Gate Tunnel (under construction / planned)
The West Gate Tunnel is a major new road tunnel project in Melbourne, Australia, designed to provide an alternative river crossing to the West Gate Bridge and improve traffic flow between the western suburbs and the city.
|
E1944171
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: West Gate Tunnel (under construction / planned) | Statement: [West Gate Freeway, connectsTo, West Gate Tunnel (under construction / planned)]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: West Gate Tunnel (under construction / planned) Triple: [West Gate Freeway, connectsTo, West Gate Tunnel (under construction / planned)]
Generated description
The West Gate Tunnel is a major new road tunnel project in Melbourne, Australia, designed to provide an alternative river crossing to the West Gate Bridge and improve traffic flow between the western suburbs and the city.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224ce48348190bd0fc23f656ed683 |
completed | April 29, 2026, 3:33 p.m. |
| NER | Named-entity recognition | batch_69f6966a1d2c8190ab0f75e9adfdf8e5 |
completed | May 3, 2026, 12:27 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a292b2f94ac819099ba9f0b20e3cbe2 |
completed | June 10, 2026, 9:15 a.m. |
| NEDg | Description generation | batch_6a292c16ae008190bac905923bd17425 |
completed | June 10, 2026, 9:19 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a292caa0590819087d6b9d576701697 |
completed | June 10, 2026, 9:21 a.m. |
Created at: April 29, 2026, 9:02 p.m.