Triple
T30887135
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Jordan River |
E786797
|
entity |
| Predicate | hasPowerStation |
P17850
|
FINISHED |
| Object |
Jordan River Generating Station
Jordan River Generating Station is a hydroelectric power facility located on Vancouver Island in British Columbia, Canada, that generates electricity from the Jordan River.
|
E1936861
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jordan River Generating Station | Statement: [Jordan River, hasPowerStation, Jordan River Generating Station]
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Jordan River Generating Station Triple: [Jordan River, hasPowerStation, Jordan River Generating Station]
Generated description
Jordan River Generating Station is a hydroelectric power facility located on Vancouver Island in British Columbia, Canada, that generates electricity from the Jordan River.
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f224bbfa7c81908448e0c261c523e3 |
completed | April 29, 2026, 3:33 p.m. |
| NER | Named-entity recognition | batch_69f69206481881909e9f3d0e59c5b889 |
completed | May 3, 2026, 12:08 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a28c7e5c6a88190a803b84ab7a9cf6b |
completed | June 10, 2026, 2:11 a.m. |
| NEDg | Description generation | batch_6a28ccc9c0388190b1b920448cdbd65f |
completed | June 10, 2026, 2:32 a.m. |
| NED2 | Entity disambiguation (via description) | batch_6a28cd8c608c8190938c471d2e1fd8eb |
completed | June 10, 2026, 2:35 a.m. |
Created at: April 29, 2026, 8:49 p.m.