Triple

T30768904
Position Surface form Disambiguated ID Type / Status
Subject U.S. Army Corps of Engineers (New Hogan Dam and Lake) E783455 entity
Predicate operates P24 FINISHED
Object New Hogan Reservoir
New Hogan Reservoir is a man-made lake in California that provides flood control, water storage, and recreational opportunities for the surrounding region.
E1934866 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: New Hogan Reservoir | Statement: [U.S. Army Corps of Engineers (New Hogan Dam and Lake), operates, New Hogan Reservoir]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: New Hogan Reservoir
Triple: [U.S. Army Corps of Engineers (New Hogan Dam and Lake), operates, New Hogan Reservoir]
Generated description
New Hogan Reservoir is a man-made lake in California that provides flood control, water storage, and recreational opportunities for the surrounding region.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f224b1519081908b9db003fd2073e0 completed April 29, 2026, 3:33 p.m.
NER Named-entity recognition batch_69f68fbffc3481909fc9b762f2cc5dd4 completed May 2, 2026, 11:58 p.m.
NED1 Entity disambiguation (via context triple) batch_6a28c7bd7a4c81908dc71d5eb045f5d9 completed June 10, 2026, 2:11 a.m.
NEDg Description generation batch_6a28c9d3aa008190b4d42d25f3e299a2 completed June 10, 2026, 2:20 a.m.
NED2 Entity disambiguation (via description) batch_6a28ca4d933481909469dd7aaf9754fd completed June 10, 2026, 2:22 a.m.
Created at: April 29, 2026, 8:40 p.m.