Triple

T30311799
Position Surface form Disambiguated ID Type / Status
Subject U.S. Highways in Ohio E770944 entity
Predicate hasRoute P4374 FINISHED
Object U.S. Route 24 in Ohio
U.S. Route 24 in Ohio is a major east–west federal highway traversing the northern part of the state, connecting the Indiana border through the Toledo area toward Michigan and serving as an important regional freight and commuter corridor.
E1915741 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 24 in Ohio | Statement: [U.S. Highways in Ohio, hasRoute, U.S. Route 24 in Ohio]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: U.S. Route 24 in Ohio
Triple: [U.S. Highways in Ohio, hasRoute, U.S. Route 24 in Ohio]
Generated description
U.S. Route 24 in Ohio is a major east–west federal highway traversing the northern part of the state, connecting the Indiana border through the Toledo area toward Michigan and serving as an important regional freight and commuter corridor.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f22488f224819081b0f3ec41ab975c completed April 29, 2026, 3:32 p.m.
NER Named-entity recognition batch_69f6816c17e08190b543186d578dca88 completed May 2, 2026, 10:57 p.m.
NED1 Entity disambiguation (via context triple) batch_6a27989d5fd0819097aab24fa5d9ce33 completed June 9, 2026, 4:37 a.m.
NEDg Description generation batch_6a279b4477108190b3c2d60ab9ac5c15 completed June 9, 2026, 4:49 a.m.
NED2 Entity disambiguation (via description) batch_6a279ba7ee108190b856c41db2cc4b7e completed June 9, 2026, 4:50 a.m.
Created at: April 29, 2026, 7:50 p.m.