Triple

T29810988
Position Surface form Disambiguated ID Type / Status
Subject Uniper Kraftwerke E756961 entity
Predicate operatesFacilityAt P4904 FINISHED
Object Forggensee hydroelectric power plant
The Forggensee hydroelectric power plant is a German hydropower facility that generates electricity using water from the Forggensee reservoir in Bavaria.
E1887391 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Forggensee hydroelectric power plant | Statement: [Uniper Kraftwerke, operatesFacilityAt, Forggensee hydroelectric power plant]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Forggensee hydroelectric power plant
Triple: [Uniper Kraftwerke, operatesFacilityAt, Forggensee hydroelectric power plant]
Generated description
The Forggensee hydroelectric power plant is a German hydropower facility that generates electricity using water from the Forggensee reservoir in Bavaria.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: operatesFacilityAt
Context triple: [Uniper Kraftwerke, operatesFacilityAt, Forggensee hydroelectric power plant]
  • A. operatesFacility chosen
    Indicates that an entity is responsible for running, managing, or controlling the operations of a particular facility.
  • B. operatesFacilitiesType
    Indicates that an entity runs or manages facilities of a specified type.
  • C. operatedFacilitiesIn
    Indicates that an entity has managed or run facilities located within a specified place or jurisdiction.
  • D. operatesFacilityInCity
    Indicates that an entity manages or runs a particular facility located within a specified city.
  • E. operatesAtTime
    Indicates that an action, process, or system is functioning or active during a specified time or time interval.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f2245584848190ad4cab1f07752ccb completed April 29, 2026, 3:31 p.m.
NER Named-entity recognition batch_69ff2eb19ad88190915fbbe08e8bc84e completed May 9, 2026, 12:55 p.m.
NED1 Entity disambiguation (via context triple) batch_6a26e5f17d408190a95e3747dd70b447 completed June 8, 2026, 3:55 p.m.
NEDg Description generation batch_6a26e732f0e0819083339b975200cb17 completed June 8, 2026, 4 p.m.
NED2 Entity disambiguation (via description) batch_6a26e809c3a88190bba9c39027ab587a completed June 8, 2026, 4:04 p.m.
PD Predicate disambiguation batch_69ff2db5dd608190b7b7ba95f19c276c completed May 9, 2026, 12:51 p.m.
Created at: April 29, 2026, 5:23 p.m.