Triple

T29292956
Position Surface form Disambiguated ID Type / Status
Subject Kiewa River E742732 entity
Predicate partOf P40 FINISHED
Object Kiewa Hydroelectric Scheme
The Kiewa Hydroelectric Scheme is a major hydroelectric power development in northeastern Victoria, Australia, comprising a network of dams, reservoirs, and power stations that harness the flow of the Kiewa River to generate electricity.
E1858862 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kiewa Hydroelectric Scheme | Statement: [Kiewa River, partOf, Kiewa Hydroelectric Scheme]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Kiewa Hydroelectric Scheme
Triple: [Kiewa River, partOf, Kiewa Hydroelectric Scheme]
Generated description
The Kiewa Hydroelectric Scheme is a major hydroelectric power development in northeastern Victoria, Australia, comprising a network of dams, reservoirs, and power stations that harness the flow of the Kiewa River to generate electricity.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f0912323c48190b9a24ef8cf359225 completed April 28, 2026, 10:51 a.m.
NER Named-entity recognition batch_69f66541ad908190bfae0c3070a1f4c0 completed May 2, 2026, 8:57 p.m.
NED1 Entity disambiguation (via context triple) batch_6a25894829048190a39d4d15a3b1f9fc completed June 7, 2026, 3:07 p.m.
NEDg Description generation batch_6a258f43d2bc8190af68bfc20f53ed0b completed June 7, 2026, 3:33 p.m.
NED2 Entity disambiguation (via description) batch_6a2590cee2d48190bb97e1edad575520 completed June 7, 2026, 3:39 p.m.
Created at: April 28, 2026, 1:03 p.m.