Triple
T29133054
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Woodstock Road bus corridor |
E738431
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bus corridor |
C2952
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bus corridor Context triple: [Woodstock Road bus corridor, instanceOf, bus corridor]
-
A.
transport corridor
chosen
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
-
B.
underground rail corridor
An underground rail corridor is a subsurface passageway engineered to safely guide trains between stations, housing tracks, utilities, and supporting infrastructure while minimizing surface disruption.
-
C.
institutional corridor
An institutional corridor is a long, functional passageway within a formal facility (such as a school, hospital, or government building) that connects rooms and departments while regulating movement and access.
-
D.
business corridor
A business corridor is a concentrated area along a major route or within a district where commercial, office, and retail activities are clustered to support economic activity and accessibility.
-
E.
suburban railway corridor
A suburban railway corridor is a dedicated rail route connecting city centers with surrounding residential suburbs, designed to support frequent, high-capacity commuter train services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f07cb3adb48190a9e0e169cd026634 |
completed | April 28, 2026, 9:24 a.m. |
Created at: April 28, 2026, 11:32 a.m.