Triple

T29065547
Position Surface form Disambiguated ID Type / Status
Subject Brock (M20 barrier system nickname) E735663 entity
Predicate nicknameFor P2937 FINISHED
Object M20 contraflow barrier system
The M20 contraflow barrier system is a movable road barrier installation on England’s M20 motorway designed to quickly create or remove contraflow lanes, particularly to manage traffic during cross-Channel disruption.
E1847700 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M20 contraflow barrier system | Statement: [Brock (M20 barrier system nickname), nicknameFor, M20 contraflow barrier system]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: M20 contraflow barrier system
Triple: [Brock (M20 barrier system nickname), nicknameFor, M20 contraflow barrier system]
Generated description
The M20 contraflow barrier system is a movable road barrier installation on England’s M20 motorway designed to quickly create or remove contraflow lanes, particularly to manage traffic during cross-Channel disruption.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f077e85498819088b65186550da8cd completed April 28, 2026, 9:03 a.m.
NER Named-entity recognition batch_69f6609a8bfc8190bbf7855ef75416c2 completed May 2, 2026, 8:37 p.m.
NED1 Entity disambiguation (via context triple) batch_6a251f81f9c88190b0130fd2d80ddc49 completed June 7, 2026, 7:36 a.m.
NEDg Description generation batch_6a2523860108819094d3f9409a33dd38 completed June 7, 2026, 7:53 a.m.
NED2 Entity disambiguation (via description) batch_6a2527594d448190992da1d867a62c68 completed June 7, 2026, 8:10 a.m.
Created at: April 28, 2026, 10:17 a.m.