Triple

T28423285
Position Surface form Disambiguated ID Type / Status
Subject Trishuli River E719999 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Upper Trishuli 1 Hydropower Project
Upper Trishuli 1 Hydropower Project is a major run-of-river hydroelectric power development in Nepal designed to harness the Trishuli River for renewable electricity generation.
E1821236 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Trishuli 1 Hydropower Project | Statement: [Trishuli River, hasHydropowerProject, Upper Trishuli 1 Hydropower Project]
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Upper Trishuli 1 Hydropower Project
Triple: [Trishuli River, hasHydropowerProject, Upper Trishuli 1 Hydropower Project]
Generated description
Upper Trishuli 1 Hydropower Project is a major run-of-river hydroelectric power development in Nepal designed to harness the Trishuli River for renewable electricity generation.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eff6f1c5088190bc24bfbf92f9c017 completed April 27, 2026, 11:53 p.m.
NER Named-entity recognition batch_69f64dfc22188190a71aa737d6320d61 completed May 2, 2026, 7:18 p.m.
NED1 Entity disambiguation (via context triple) batch_6a1cac36bbe48190a6aaf93406fd0294 completed May 31, 2026, 9:46 p.m.
NEDg Description generation batch_6a1cacb5263481909564ae00060c003e completed May 31, 2026, 9:48 p.m.
NED2 Entity disambiguation (via description) batch_6a1cad97f90c819090f2ae899ebb32d9 completed May 31, 2026, 9:52 p.m.
Created at: April 28, 2026, 1:35 a.m.